华能澜沧江202405检修用品询价采购公告
采购编号:****
1.采购条件
本项目:华能澜沧江202405检修用品,采购人为:****,该项目已具备采购条件,现进行合格供应商公开询价。
2.项目概况与采购范围
2.1 项目概况:
华能澜沧江202405检修用品
2.2 采购范围
1 | XC202********012 | ****48205 | 六角头螺栓\M20\90\316L\A2-70 | ****0101 | ****0101 | 210 | 件 | 2024-04-10 | 2024-08-30 | 2024-06-30 | 2024-06-30 | 2024-08-30 | ********电厂 | |||||
2 | XC202********012 | ****36590 | 丝锥\手用丝锥\3/4-14NPT | ****0212 | ****0212 | 1 | 件 | 2024-05-10 | 2024-08-30 | 2024-08-30 | 2024-08-30 | 2024-08-30 | ********电厂 | |||||
3 | XC202********012 | ****08209 | 挂锁\M-L01\不锈钢\普通型 | ****0205 | ****0205 | 40 | 件 | 2024-03-10 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | ********电厂 | |||||
4 | XC202********012 | ****70103 | 快速接头\CEJN****452\304 | ****0118 | ****0118 | 4 | 件 | 2024-03-20 | 2024-04-10 | 2024-04-10 | 2024-04-10 | 2024-04-10 | ****乌弄龙﹒****电厂 | |||||
5 | XC202********012 | ****83663 | 充电电池\T-105PLUS\6V\225AH | ****0506 | ****0506 | 4 | 件 | 2024-03-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
6 | XC202********012 | ****91055 | 工具包\9PK-710P | ****0202 | ****0202 | 16 | 件 | 2024-04-20 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
7 | XC202********012 | ****07099 | 试验用辅助器材\测试线包\DDC-1.5\5M | ****0901 | ****0901 | 2 | 件 | 2024-03-25 | 2024-05-15 | 2024-05-20 | 2024-05-20 | 2024-05-15 | ****黄登﹒****电厂 | |||||
8 | XC202********012 | ****67649 | 六角头螺栓\M20\95\304L\A2-70 | ****0101 | ****0101 | 100 | 件 | 2024-03-10 | 2024-08-30 | 2024-08-30 | 2024-08-30 | 2024-08-30 | ********电厂 | |||||
9 | XC202********012 | ****25952 | 丝锥\手用丝锥\1/2*12 | ****0212 | ****0212 | 2 | 件 | 2024-05-10 | 2024-08-30 | 2024-08-30 | 2024-08-30 | 2024-08-30 | ********电厂 | |||||
10 | XC202********012 | ****15654 | 电动螺丝刀\DY-DP-04-2-B-1 | ****0206 | ****0206 | 1 | 件 | 2024-03-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
11 | XC202********012 | ****78906 | 试验用辅助器材\试验线插针\DDC\2*18 | ****0901 | ****0901 | 60 | 件 | 2024-03-10 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | ********电厂 | |||||
12 | XC202********012 | ****10321 | 内六角螺栓\M5\50\35CrMoA\8.8 | ****0106 | ****0106 | 100 | 件 | 2024-03-20 | 2024-10-10 | 2024-10-10 | 2024-10-10 | 2024-10-10 | ****乌弄龙﹒****电厂 | |||||
13 | XC202********012 | ****32594 | 六角螺母\M45\45\8.8 | ****0301 | ****0301 | 200 | 件 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
14 | XC202********012 | ****21009 | 多功能电动工具\热风枪\1800W | ****1012 | ****1012 | 2 | 件 | 2024-03-10 | 2024-06-30 | 2024-04-30 | 2024-04-30 | 2024-06-30 | ********电厂 | |||||
15 | XC202********012 | ****41110 | 焊接法兰\150\2.50MPa\Q235A | ****0408 | ****0408 | 4 | 件 | 2024-06-10 | 2024-08-20 | 2024-08-26 | 2024-08-26 | 2024-08-20 | ****黄登﹒****电厂 | |||||
16 | XC202********012 | ****21611 | 农业手工工具\镰刀\含柄\560MM | ****0305 | ****0305 | 8 | 件 | 2024-03-10 | 2024-06-30 | 2024-04-30 | 2024-04-30 | 2024-06-30 | ********电厂 | |||||
17 | XC202********012 | ****92406 | 快速接头\CEJN****402\304 | ****0118 | ****0118 | 10 | 件 | 2024-03-20 | 2024-04-10 | 2024-04-10 | 2024-04-10 | 2024-04-10 | ****乌弄龙﹒****电厂 | |||||
18 | XC202********012 | ****39909 | 双头螺栓\M27\140\45\8.8 | ****0109 | ****0109 | 50 | 件 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
19 | XC202********012 | ****70101 | 快速接头\CEJN****402\304 | ****0118 | ****0118 | 4 | 件 | 2024-03-20 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | ****乌弄龙﹒****电厂 | |||||
20 | XC202********012 | ****97958 | 钳子\斜嘴钳\MN-A04 | ****0503 | ****0503 | 25 | 件 | 2024-04-20 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ****苗尾﹒****电厂 | |||||
21 | XC202********012 | ****40003 | 其它灯泡、灯管\移动升降灯\ZL8301-C-IP65\2000W\AC220V | ****0110 | ****0110 | 1 | 件 | 2024-04-05 | 2024-05-05 | 2024-05-05 | 2024-05-05 | 2024-05-05 | ****乌弄龙﹒****电厂 | |||||
22 | XC202********012 | ****13698 | 内六角螺栓\M22\40\316L\A2-70 | ****0106 | ****0106 | 120 | 件 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
23 | XC202********012 | ****70101 | 快速接头\CEJN****402\304 | ****0118 | ****0118 | 10 | 件 | 2024-03-20 | 2024-05-30 | 2024-05-30 | 2024-05-30 | 2024-05-30 | ****乌弄龙﹒****电厂 | |||||
24 | XC202********012 | ****41508 | 其他专用仪器仪表\光学合像水平仪\165HX-1 | ****9901 | ****9901 | 1 | 台 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
25 | XC202********012 | ****51269 | 标签\合格证标签\30*20MM\温龙印刷 | ****0807 | ****0807 | 2 | 盒 | 2024-03-10 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | ********电厂 | |||||
26 | XC202********012 | ****49285 | 望远镜\TP3207\10*50 | ****0501 | ****0501 | 6 | 件 | 2024-04-05 | 2024-05-05 | 2024-05-05 | 2024-05-05 | 2024-05-05 | ****乌弄龙﹒****电厂 | |||||
27 | XC202********012 | ****33973 | 安装式电压表\SHER44L1\0~450VAC\1.5\模拟式 | ****0102 | ****0102 | 1 | 件 | 2024-04-20 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-04-10 | ********电厂 | |||||
28 | XC202********012 | ****92406 | 快速接头\CEJN****402\304 | ****0118 | ****0118 | 30 | 件 | 2024-03-20 | 2024-05-06 | 2024-05-06 | 2024-05-06 | 2024-05-06 | ****乌弄龙﹒****电厂 | |||||
29 | XC202********012 | ****22197 | 丝锥\手用丝锥\3/8*16 | ****0212 | ****0212 | 2 | 件 | 2024-03-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
30 | XC202********012 | ****33969 | 安装式电流表\SHER44L1\0~75A\1.5\模拟式 | ****0101 | ****0101 | 1 | 件 | 2024-04-20 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-04-10 | ********电厂 | |||||
31 | XC202********012 | ****23640 | 防静电、导电鞋(靴)\20KV\绝缘\普通 | ****0503 | ****0503 | 2 | 双 | 具体型号为51509 | 2024-03-25 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ****苗尾﹒****电厂 | ||||
32 | XC202********012 | ****63968 | 万用表\101-KIT\模拟式 | ****0209 | ****0209 | 15 | 件 | 2024-04-20 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ****苗尾﹒****电厂 | |||||
33 | XC202********012 | ****69380 | 其他保温材料\软连接\1400*720*180mm\厚帆布 | ****9901 | ****9901 | 1 | 件 | 2024-03-20 | 2024-05-30 | 2024-05-30 | 2024-05-30 | 2024-05-30 | ****乌弄龙﹒****电厂 | |||||
34 | XC202********012 | ****64380 | 试验用辅助器材\鳄鱼夹\DCC\5MM | ****0901 | ****0901 | 50 | 件 | 2024-03-20 | 2024-05-30 | 2024-05-30 | 2024-05-30 | 2024-05-30 | ****乌弄龙﹒****电厂 | |||||
35 | XC202********012 | ****16834 | 螺丝刀\一字\绝缘\0.6*3.5*100MM | ****0508 | ****0508 | 20 | 件 | 2024-03-10 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | ********电厂 | |||||
36 | XC202********012 | ****95198 | 试验用辅助器材\放电棒\35KV | ****0901 | ****0901 | 3 | 件 | 2024-03-20 | 2024-05-30 | 2024-05-30 | 2024-05-30 | 2024-05-30 | ****乌弄龙﹒****电厂 | |||||
37 | XC202********012 | ****98571 | 补偿器(膨胀节)备件\管道修补器\DN200 φ219 | ****0904 | ****0904 | 6 | 千克 | 2024-04-30 | 2024-05-31 | 2024-05-31 | 2024-05-31 | 2024-05-31 | 华****公司 | |||||
38 | XC202********012 | ****14910 | 气动吹尘枪\UMS-C002 | ****5012 | ****5012 | 2 | 件 | 2024-05-10 | 2024-08-30 | 2024-08-30 | 2024-08-30 | 2024-08-30 | ********电厂 | |||||
39 | XC202********012 | ****94605 | 焊接异径三通\100\65\4\0Cr18Ni9 | ****0411 | ****0411 | 3 | 件 | 2024-06-10 | 2024-08-20 | 2024-08-26 | 2024-08-26 | 2024-08-20 | ****黄登﹒****电厂 | |||||
40 | XC202********012 | ****09996 | 六角头螺栓\M10\30\304\A2-70 | ****0101 | ****0101 | 120 | 件 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
41 | XC202********012 | ****98591 | 补偿器(膨胀节)备件\管道修补器\DN150 φ168 | ****0904 | ****0904 | 3 | 千克 | 2024-04-30 | 2024-05-31 | 2024-05-31 | 2024-05-31 | 2024-05-31 | 华****公司 | |||||
42 | XC202********012 | ****70103 | 快速接头\CEJN****452\304 | ****0118 | ****0118 | 10 | 件 | 2024-03-20 | 2024-05-30 | 2024-05-30 | 2024-05-30 | 2024-05-30 | ****乌弄龙﹒****电厂 | |||||
43 | XC202********012 | ****73975 | 试验用辅助器材\电工技术试验箱\DZ-220V\1300*800*400 | ****0901 | ****0901 | 1 | 件 | 2024-03-25 | 2024-05-15 | 2024-06-20 | 2024-06-20 | 2024-05-15 | ****黄登﹒****电厂 | |||||
44 | XC202********012 | ****30630 | 接地工具\接地线\50mm | ****0211 | ****0211 | 500 | 米 | 2024-05-20 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ****苗尾﹒****电厂 | |||||
45 | XC202********012 | ****51515 | 刀类\美工刀\DK-2039 | ****0402 | ****0402 | 5 | 件 | 2024-05-10 | 2024-08-30 | 2024-08-30 | 2024-08-30 | 2024-08-30 | ********电厂 | |||||
46 | XC202********012 | ****69988 | 试验用辅助器材\测试插孔头\J4/S3\φ4 | ****0901 | ****0901 | 30 | 件 | 2024-03-25 | 2024-05-15 | 2024-05-20 | 2024-05-20 | 2024-05-15 | ****黄登﹒****电厂 | |||||
47 | XC202********012 | ****36567 | 润滑油\真空泵油\LVO-130\5L | ****0501 | ****0501 | 2 | 桶 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
48 | XC202********012 | ****72556 | 焊条电弧焊机\TAZ-2100 | ****0101 | ****0101 | 3 | 台 | 2024-05-30 | 2024-07-08 | 2024-08-13 | 2024-08-13 | 2024-07-08 | ****黄登﹒****电厂 | |||||
49 | XC202********012 | ****24660 | 镀锌管\200\6\Q235 | ****0514 | ****0514 | 9738 | 千克 | 2024-04-15 | 2024-06-28 | 2024-06-28 | 2024-06-28 | 2024-06-28 | ********电厂 | |||||
50 | XC202********012 | ****58644 | 其他电工器材\充电式热风枪\GHG-18V-50 | ****9902 | ****9902 | 1 | 件 | 2024-03-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
51 | XC202********012 | ****60850 | 六角螺母\M27\20\8.8 | ****0301 | ****0301 | 100 | 件 | 2024-03-10 | 2024-05-30 | 2024-05-30 | 2024-05-30 | 2024-05-30 | ********电厂 | |||||
52 | XC202********012 | ****46598 | 电烙铁\10W\内热 | ****0206 | ****0206 | 2 | 件 | 2024-05-10 | 2024-08-30 | 2024-08-30 | 2024-08-30 | 2024-08-30 | ********电厂 | |||||
53 | XC202********012 | ****81719 | 其他电工器材\放电棒\GZF-10-10KV | ****9902 | ****9902 | 3 | 件 | 2024-03-20 | 2024-05-30 | 2024-05-30 | 2024-05-30 | 2024-05-30 | ****乌弄龙﹒****电厂 | |||||
54 | XC202********012 | ****14316 | 扳手\活扳手\直柄\57*300MM\40Cr | ****0506 | ****0506 | 2 | 件 | 2024-03-10 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | ********电厂 | |||||
55 | XC202********012 | ****13658 | 其它取样器\油三通\BY2003 | ****0409 | ****0409 | 2 | 件 | 2024-03-20 | 2024-05-30 | 2024-05-30 | 2024-05-30 | 2024-05-30 | ****乌弄龙﹒****电厂 | |||||
56 | XC202********012 | ****58040 | 电线套管\20\钢镀锌 | ****0516 | ****0516 | 1500 | 千克 | 2024-03-15 | 2024-05-06 | 2024-05-06 | 2024-05-06 | 2024-05-06 | ********电厂 | |||||
57 | XC202********012 | ****46383 | 焊接三通\42\4.5\90\304 | ****0407 | ****0407 | 20 | 件 | 2024-04-15 | 2024-06-28 | 2024-06-28 | 2024-06-28 | 2024-06-28 | ********电厂 | |||||
58 | XC202********012 | ****39280 | 安装式电压表\SX48\0~300VAC\0.01\模拟式 | ****0102 | ****0102 | 10 | 件 | 2024-05-15 | 2024-08-12 | 2024-08-15 | 2024-08-15 | 2024-08-12 | ****黄登﹒****电厂 | |||||
59 | XC202********012 | ****59152 | 游标卡尺\数显游标卡尺\0~150MM\0.001 | ****0111 | ****0111 | 2 | 件 | 2024-05-10 | 2024-08-30 | 2024-08-30 | 2024-08-30 | 2024-08-30 | ********电厂 | |||||
60 | XC202********012 | ****55033 | 其它容器\储油罐\1T | ****0601 | ****0601 | 1 | 件 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
61 | XC202********012 | ****45461 | 扳手\指示表式力矩扳手\直柄\500NM\铬钒钢 | ****0506 | ****0506 | 2 | 件 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
62 | XC202********012 | ****58793 | 充电电池\TI25\7.2V | ****0506 | ****0506 | 2 | 件 | 2024-03-10 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | ********电厂 | |||||
63 | XC202********012 | ****98578 | 补偿器(膨胀节)备件\管道修补器\DN100 φ108 | ****0904 | ****0904 | 2 | 千克 | 2024-04-30 | 2024-05-31 | 2024-05-31 | 2024-05-31 | 2024-05-31 | 华****公司 | |||||
64 | XC202********012 | ****00082 | 电气绝缘试验仪器\绝缘电阻测试仪\1508 | ****0401 | ****0401 | 1 | 台 | 2024-03-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
65 | XC202********012 | ****21608 | 不锈钢角钢\40\5\304 | ****0235 | ****0235 | 100 | 千克 | 2024-06-05 | 2024-08-02 | 2024-08-06 | 2024-08-06 | 2024-08-02 | ****黄登﹒****电厂 | |||||
66 | XC202********012 | ****40657 | 10kW及以上交流电动机\M2QA315S4A\110KW\380V\199A\立式\1485r/min\A\IP44 | ****0102 | ****0102 | 1 | 台 | 2024-04-20 | 2024-08-31 | 2024-08-31 | 2024-08-31 | 2024-08-31 | ****苗尾﹒****电厂 | |||||
67 | XC202********012 | ****92953 | 螺丝刀\一字\绝缘\0.8*4*100MM | ****0508 | ****0508 | 20 | 件 | 2024-03-10 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | ********电厂 | |||||
68 | XC202********012 | ****82258 | 其他电工器材\放电棒\GZF-10-35KV | ****9902 | ****9902 | 3 | 件 | 2024-03-20 | 2024-05-30 | 2024-05-30 | 2024-05-30 | 2024-05-30 | ****乌弄龙﹒****电厂 | |||||
69 | XC202********012 | ****36310 | 其他建筑材料\防汛挡板\700*680*520 | ****9904 | ****9904 | 50 | 件 | 2024-03-28 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 华****公司 | |||||
70 | XC202********012 | ****15655 | 手摇泵\手动抽油泵\HD-E-2-V-AL-1200-HP | ****9904 | ****9904 | 1 | 件 | 2024-03-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
71 | XC202********012 | ****06739 | 注射器\100ML | ****0319 | ****0319 | 50 | 件 | 2024-03-10 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | ********电厂 | |||||
72 | XC202********012 | ****14171 | 润滑油\真空泵油\LVO-100\5L | ****0501 | ****0501 | 5 | 桶 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
73 | XC202********012 | ****61122 | 丝锥\手用丝锥\5/8*11 | ****0212 | ****0212 | 2 | 件 | 2024-03-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
74 | XC202********012 | ****98581 | 补偿器(膨胀节)备件\管道修补器\DN100 φ114 | ****0904 | ****0904 | 2 | 千克 | 2024-04-30 | 2024-05-31 | 2024-05-31 | 2024-05-31 | 2024-05-31 | 华****公司 | |||||
75 | XC202********012 | ****07930 | 其它灯泡、灯管\LED灯带\5050\20W\12V | ****0110 | ****0110 | 2 | 件 | 2024-03-20 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | ****乌弄龙﹒****电厂 | |||||
76 | XC202********012 | ****65650 | 六角头螺栓\M24\100\316L\A2-70 | ****0101 | ****0101 | 60 | 件 | 2024-03-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
77 | XC202********012 | ****05930 | LED灯\T8-1200MM\60W\白色 | ****0101 | ****0101 | 80 | 件 | 2024-03-20 | 2024-04-30 | 2024-04-30 | 2024-04-30 | 2024-04-30 | ****苗尾﹒****电厂 | |||||
78 | XC202********012 | ****55034 | 其它容器\储油罐\35T | ****0601 | ****0601 | 1 | 件 | 2024-04-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
79 | XC202********012 | ****74561 | 绝缘手套\E214RB\20KV | ****0312 | ****0312 | 2 | 双 | 具体型号为E214RB | 2024-03-25 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ****苗尾﹒****电厂 | ||||
80 | XC202********012 | ****72740 | 焊接三通\100\4\90\2.5MPa\06Cr19Ni10 | ****0407 | ****0407 | 3 | 件 | 2024-06-10 | 2024-08-20 | 2024-08-26 | 2024-08-26 | 2024-08-20 | ****黄登﹒****电厂 | |||||
81 | XC202********012 | ****15653 | 角向磨光机\DLX-KC-003 | ****0107 | ****0107 | 1 | 件 | 2024-03-10 | 2024-06-30 | 2024-06-30 | 2024-06-30 | 2024-06-30 | ********电厂 | |||||
82 | XC202********012 | ****73674 | 紫铜排\3\16\T2 | ****0502 | ****0502 | 2 | 千克 | 2024-03-25 | 2024-05-15 | 2024-05-20 | 2024-05-20 | 2024-05-15 | ****黄登﹒****电厂 | |||||
83 | XC202********012 | ****94640 | 膨胀螺栓\M14\120\304 | ****0111 | ****0111 | 1000 | 件 | 2024-04-15 | 2024-06-28 | 2024-06-28 | 2024-06-28 | 2024-06-28 | ********电厂 |
3.供应商资格要求
3.1 通用条件:
(1****集团供应商库内合格供应商,满足供应商参与业务的权限,且不处于供应商暂停参加采购活动的期限内。 (供应商参与业务的权限:一级供应商分为一级集采供应商和总部部门供应商。一级集****集团范围内所有单位提供采购服务;华能集团总部部****集团所有总部部门提供采购服务。二****集团所有二级单位及其所辖企业提供采购服务。未成为合格供应商的,****集团有限公司电子商务平台注册成为潜在供应商,潜在****集团或二级单位组织审定,成为合格供应商,并按照参与业务的权限提供采购服务。) (2)近三年没有严重违约,没有经鉴定部门认定的因其产品/服务/工程引起的重大及以上质量事故或重大及以上安全事故; (3****管理部门在**企业信用信息公示系统中列入经营异常名录或者严重违法企业名单; (4****法院在“信用中国”网站(www.****.cn)或各级信用信息共享平台中列入失信被执行人名单; (5)不存在不同供应商的响应文件的互联网协议地址(IP地址)信息检查一致的情况。 (6)与采购人存在利害关系可能影响采购公正性的法人、其他组织或者个人,不得参加询价;单位负责人为同一人或者存在控股、管理关系的不同单位,不得参加同一询价项目。 (7)不存在违反国****集团相关制度的情况。
3.2 专项条件:
无
4.采购文件的获取
有意向的供应商可在截止时间前:2024年06月17日11时17分止(**时间,下同),****集团电子商务平台(https://uum.****.cn/),选择“智能招采”进入系统选择参与的项目,下载采购文件。采购文件费:0元。
5.响应文件的递交
5.1 供应商应按采购文件规定的递交截止时间前登陆电子商务平台,完成响应文件的传输递交, 递交截止时间前未完成响应文件递交的视为放弃询价资格。
5.2 响应文件的递交截止时间:2024年06月17日11时17分;响应文件开启时间:同递交截止时间。
5.3 CA证书办理
供应商须凭“中招互连”APP办理CA证书相关事宜。使用手机扫码下载、注册“中招互连”APP(https:/ebinterlink.com/)并自助办理CA证书。根据提示即可在线办理相关事宜。扫码签章等所有流程全部使用中招互连APP操作。如有问题,请联系客服电话:400-6664-230。
6.发布公告的媒介
本次采****集团电子商务平台(https://ec.****.cn/)发布,因轻信其他组织、个人或媒介提供的信息而造成的损失,采购人、采购代理机构概不负责。
7.联系方式
2024年06月12日