Validation of all systems, mechanisms, and software to insure that they meet process requirements
Validation of all functions requirements such as throughput, handling, MTBF, MTTR, repeatability, data capture and ing
Continuous run 24 hours with no cosmetic damage, no DT and no failures before delivery
Error ing and recovery checks
System safety interlocks
Start-up, set-up verification, basic operation and shutdown
Any deliverable not met will be listed as an exception with a plan to address by SAT
All data logged for review and approval by FX_AAE required for shipment to the installation site
Site Acceptance Criteria
Document all files(Including but not only mentioned files): FAT, IQC, BU SOP, all documentation file
(e.g. Assembly SOP, Spare and consumable parts list…)
Need to collect machine performance data for 2 weeks from Ramp
If machine performance can meet criteria continuously in 2 weeks, AE should provide site acceptance list to asset and
start machine acceptance.
Will charge related cost to vendor if unplanned DT more than Criteria cause FX capacity loss
2)具有履行合同的能力,包括专业、技术资格和能力,资金、设备和其他物质设施状况,管理能力,经验、信誉和相应的从业人员。
3)没有处于被责令停业,投标资格被取消,财产被接管、冻结,破产状态。
4)在最近三年内没有骗取中标和严重违约及重大工程质量问题。
5)法律、行政法规规定的其他资格条件。
1.凡有意向参加投标的单位,请于 2024-06-17 15:30前在钜商网上报名 并提供相关资质文件;
2.报名费:********** 元;
3.报名成功后可下载标书文件。
![](http://wap.qianlima.com/imgs/xunhuan.png)