This is China Road and Bridge Corporation Glavna podru?nica Zagreb Projekt spojna cesta vor Vuevica” na A1 tunel Kozjak.
The Vucevica Tunnel and Connection Line Project in Croatia has a line length of 6.85km, a total contract cost of approximately 74.6 million euros, and a contract construction period of 36 months. The main project volume includes 1 long tunnel (main tunnel 2545.7m, service tunnel 2529.5m), 2 main line bridges, 4 overpasses, 1 passage, 284,000 cubic meters of roadbed filling, and 550,000 cubic meters of excavation. The implementation scope of this project includes roads, bridges, tunnels, and drainage civil construction parts, excluding traffic safety engineering, signage and marking, tunnel electromechanical, pipeline relocation and other ancillary projects.
According to the construction schedule, our project requires the purchase of 1 Mobile concrete mixing plant.
The requirements are as follows:
No. | Item Description | Model | Unit | Quantities | remarks |
1 | concrete | C12/15 | M3 | 3,782.00 | Include freight |
2 | concrete | C16/20 | M3 | 1,078.00 | Include freight |
3 | concrete | C 20/25 | M3 | 238.00 | Include freight |
4 | steel fiber shotcrete | C 24/30 | M3 | 5,658.00 | Include freight |
5 | Shotcrete | C 24/30 | M3 | 15,554.00 | Include freight |
6 | Shotcrete | C25/30 | M3 | 14,262.00 | Include freight |
7 | concrete | C25/30 | M3 | 14,732.00 | Include freight |
8 | concrete | C30/37 | M3 | 11,827.00 | Include freight |
9 | concrete | C 35/45 | M3 | 2,142.00 | Include freight |
10 | concrete | C45/55 | M3 | 21.00 | Include freight |
11 | concrete | C 50/60 | M3 | 706.00 | Include freight |
Please feel free to contact the person undersigned if you have any questions:
Name:ZhaoMeng
E-mail address:****@crbc-croatia.com
Annexures:none
We are expecting to receive your best quotation . Please attach the quotation sheet with your company qualification information(include but not limited BROAD-BASED BLACK ECONOMIC EMPOWERMENT ) and account informations.
Your prompt response will be highly appreciated.
Thanks and best regards.
1 | 混凝土 C15 | C12/C15 | 3782.****0000 | 立方米 |
2 | 混凝土 C20 | C16/C20 | 1078.****0000 | 立方米 |
3 | 混凝土 C25 | C20/c25 | 238.****0000 | 立方米 |
4 | 混凝土 C30 | C24/C30钢纤维混凝土 | 5658.****0000 | 立方米 |
5 | 混凝土 C30 | C24/C30喷射混凝土 | 15554.****0000 | 立方米 |
6 | 混凝土 C30 | C25/C30喷射混凝土 | 14262.****0000 | 立方米 |
7 | 混凝土 C30 | C25/C30混凝土 | 14732.****0000 | 立方米 |
8 | 混凝土 C35 | C30/C37混凝土 | 11827.****0000 | 立方米 |
9 | 混凝土 C45 | C35/C45混凝土 | 2142.****0000 | 立方米 |
10 | 混凝土 C55 | C45/C55混凝土 | 21.****0000 | 立方米 |
11 | 混凝土 C60 | C50/C60混凝土 | 706.****0000 | 立方米 |