INVITATION TO QUOTATION
Our Ref: METRO1/TEN/R S/2024/0009
Date: December, 1th, 2024
METRO LINEA 1 S.A.S
Add.: Calle 28 #13a-15 DAVIVIENDA CCI piso 33
Attn: To whom it may concern.
Dear Sir/Madam,
BOGOTA METRO LINE 1 (“PLMB”, or “Project”)
Invitation to Bid for Supply of Signaling Cables for PLMB. (the “Works”)
We, METRO LINEA 1 S.A.S. (the “Concessionaire”), are pleased to invite your company (the “Bidder”) to offer a bid (the “Bid”) for provision of the above-mentioned subcontract works for the Project (the “Works”).
Bidders may be natural or legal persons, local or foreign whose corporate purpose match with the purpose of this selection process, who are not involved in any prohibition, disability or incompatibility enshrined under the Colombian legal system, who are not involved in any conflict of interest under the terms established by Metro Linea 1, and that have legal capacity to present the proposal and to celebrate and perform the contract. For detailed information, please refer to the Formal Tender Documents.
Below is the general information and schedule of the Tender process.
Table 1. General Information
Name of the Project | First Line of the Bogota Metro (PLMB) |
Works | Supply of Signaling Cables for PLMB. (the “Works”) Supplier shall deliver the cables based on DDP [1] terms to Purchaser’s destination in Bogota. |
Tender No. | METRO1/TEN/R S/2024/0009 |
RFQ Documents and Addendum Clarification | Download Link: http://ec.****.cn/PMS Note: The bidder must register in the page |
Proposal documents and Request for Clarifications | Download Link: http://ec.****.cn/PMS Note: The bidder must register in the page |
Address | Calle 28 #13a-15 DAVIVIENDA CCI piso 33 |
| lizhuang.cheng@metro1.****.co |
1. If the Chinese Supplier is awarded, the Purchaser has the right to change the terms to FOB or CIF.
Table 2. Tender Process Schedule
Issue of RFQ Announcement and start to sign up for this RFQ in system | Beijing Time: November 30th, 2024 |
Deadline of signing up for this RFQ in system | Beijing Time: December 11th, 2024 |
Issue of RFQ Documents | Beijing Time: November 30 th, 2024 |
Deadline of download RFQ Documents | Beijing Time: December 11th, 2024 |
Start Time of proposal documents submission | Beijing Time: December 10nd, 2024 |
Proposal Documents Submission Deadline | Beijing Time: December 18nd, 2024 |
Request for Clarification Deadline (formal) | Beijing Time, 4 days before the deadline for the submission of the proposal documents |
We are looking forward to receiving your comments/questions.
Thank you.
1 | 信号电缆 PY 低烟无卤阻燃 6 | 准确规格型号见技术规格书和BOQ | 37515.****0000 | 米 |
2 | 信号电缆 PY 低烟无卤阻燃 4 | 准确规格型号见技术规格书和BOQ | 90540.****0000 | 米 |
3 | 信号电缆 PY 低烟无卤阻燃 3 | 准确规格型号见技术规格书和BOQ | 2445.****0000 | 米 |
4 | 信号电缆 PY 低烟无卤阻燃 26 | 准确规格型号见技术规格书和BOQ | 26890.****0000 | 米 |
5 | 信号电缆 PY 低烟无卤阻燃 9 | 准确规格型号见技术规格书和BOQ | 53535.****0000 | 米 |
6 | 信号电缆 PY 低烟无卤阻燃 30 | 准确规格型号见技术规格书和BOQ | 800.****0000 | 米 |
7 | 信号电缆 PY 低烟无卤阻燃 28 | 准确规格型号见技术规格书和BOQ | 1870.****0000 | 米 |
8 | 信号电缆 PY 低烟无卤阻燃 8 | 准确规格型号见技术规格书和BOQ | 40770.****0000 | 米 |