焦石页岩气提产增效配套工程
1、建设项目基本信息
企业基本信息
**** | 建设单位代码类型:|
****0102MA6175NK0W | 建设单位法人:李卫珩 |
常发荟 | 建设单位所在行政区划:**市**区 |
**市**区金科铂金国际17楼 |
建设项目基本信息
焦石页岩气提产增效配套工程 | 项目代码:|
建设性质: | |
2021版本:147-原油、成品油、天然气管线(不含城市天然气管线;不含城镇燃气管线;不含企业厂区内管道) | 行业类别(国民经济代码):D4511-D4511-天然气生产和供应业 |
建设地点: | **市**区 |
经度:107.66238,107.****90618,107.****433812,107.****458426,107.****691687,107.****86643,107.****642929,107.****097595,107.****067033,107.****900022,107.****891574,107.****44519,107.****158231,107.****735406,107.****792123,107.****840247,107.****238933,107.****495412,107.****104034,107.****802071,107.****533179,107.****30997,107.****541783,107.****699778,107.****497464,107.****816197,107.****29914,107.****228368,107.****69209,107.****525729,107.****633165,107.****113942,107.****865881,107.****981741,107.****474298,107.****766981,107.****511027,107.****513634,107.****539459,107.****871945,107.****973769,107.****307471,107.****876356,107.****627553,107.****586119,107.****078478,107.****015212,107.****406615,107.****579755,107.****649842,107.****793665,107.****865487,107.****009257,107.****231637,107.****231637,107.****462013,107.****910302,107.****494705,107.****725946,107.****536585,107.****546661,107.****074748,107.****80237,107.****80237,107.****535122,107.****535122,107.****039615,107.****85668,107.****85668,107.****528081,107.****528081,107.****065215,107.****636868,107.****079927,107.****020192,107.****88673,107.****835484,107.****93081,107.****597038,107.****478377,107.****730047,107.****730047,107.****730047,107.****730047,107.****730047,107.****730047,107.****730047,107.****730047,107.****81868,107.****712191,107.****53032,107.****077431,107.****077431,107.****077431,107.****077431,107.****077431,107.****077431,107.****077431,107.****797973,107.****99845,107.****3245,107.****3245,107.****608571,107.****608571,107.****608571,107.****864084,107.****416168,107.****551308,107.****551308,107.****870948,107.****870948,107.****870948,107.****931177,107.****931177,107.****241323,107.****351465,107.****601775,107.****535677,107.****535677,107.****535677,107.****186368,107.****314996,107.****51906,107.****51906,107.****51906,107.****069182,107.****900054,107.****348778,107.****150883,107.****77063,107.****77063,107.****77063,107.****433614,107.****483441,107.****994055,107.****597756,107.****989011,107.****989011,107.****959748,107.****959748,107.****255804,107.****981923,107.****203632,107.****203632,107.****227639,107.****534686,107.****718794,107.****610955,107.****610955,107.****768695,107.****008617,107.****006996,107.****676057,107.****336844,107.****042234,107.****147851,107.****147851,107.****410109,107.****473463,107.****473463,107.****36226,107.****106694,107.****146369,107.****832673,107.****60241,107.****970985,107.****963414,107.****86084,107.****225361,107.****682515,107.****830761,107.****493489,107.****358499,107.****921543,107.****361448,107.****659199,107.****102724,107.****907598,107.****288058,107.****450119,107.****861391,107.****108231,107.****979438,107.****902965,107.****853327,107.****84003,107.****287265,107.****759285,107.****802427,107.****552781,107.****91817,107.****957269,107.****926184,107.****868674,107.****204096,107.****061496,107.****518215,107.****14767,107.****361112,107.****355826,107.****08124,107.****239692,107.****487115,107.****375631,107.****280962,107.****567173,107.****760409,107.****214525,107.****397858,107.****39393,107.****189144,107.****630906,107.****863833,107.****873984,107.****377199,107.****900414,107.****105229,107.****067368,107.****782051,107.****405966,107.****584315,107.****420153,107.****799854,107.****537826,107.****318153,107.****658407,107.****60107,107.****111705 纬度: 29.6957,29.****011065,29.****214361,29.****09027,29.****071708,29.****782273,29.****695573,29.****844513,29.****890759,29.****866109,29.****53231,29.****529115,29.****522731,29.****970355,29.****369004,29.****686043,29.****318346,29.****52901,29.****404092,29.****75912,29.****136648,29.****295951,29.****14962,29.****14328,29.****617404,29.****255723,29.****021618,29.****816262,29.****105495,29.****333709,29.****158052,29.****141419,29.****798863,29.****968253,29.****469199,29.****77265,29.****124823,29.****12453,29.****014423,29.****692331,29.****599602,29.****447585,29.****621559,29.****081807,29.****572515,29.****155696,29.****929385,29.****539086,29.****951135,29.****461312,29.****623668,29.****924933,29.****74421,29.****98664,29.****98664,29.****30258,29.****557564,29.****034335,29.****501116,29.****145851,29.****132977,29.****000917,29.****333772,29.****333772,29.****702979,29.****702979,29.****779827,29.****02653,29.****02653,29.****928165,29.****928165,29.****919274,29.****653302,29.****841962,29.****004985,29.****367247,29.****197013,29.****176884,29.****388905,29.****900977,29.****753087,29.****753087,29.****753087,29.****753087,29.****753087,29.****753087,29.****753087,29.****753087,29.****028089,29.****102224,29.****763861,29.****763615,29.****763615,29.****763615,29.****763615,29.****763615,29.****763615,29.****763615,29.****901616,29.****08059,29.****230756,29.****230756,29.****266734,29.****266734,29.****266734,29.****53876,29.****445522,29.****316709,29.****316709,29.****352924,29.****352924,29.****352924,29.****389292,29.****389292,29.****336424,29.****267637,29.****1176,29.****052875,29.****052875,29.****052875,29.****885328,29.****851532,29.****596969,29.****596969,29.****596969,29.****968215,29.****938977,29.****280447,29.****290604,29.****784069,29.****784069,29.****784069,29.****612924,29.****5369,29.****008589,29.****009746,29.****798878,29.****798878,29.****671033,29.****671033,29.****157651,29.****052528,29.****283596,29.****283596,29.****859066,29.****552984,29.****698145,29.****93529,29.****93529,29.****877155,29.****410167,29.****914078,29.****166401,29.****169201,29.****473201,29.****568949,29.****568949,29.****131185,29.****306793,29.****306793,29.****994242,29.****915248,29.****629879,29.****629608,29.****795011,29.****115235,29.****355328,29.****670314,29.****084383,29.****911753,29.****8105,29.****171715,29.****876674,29.****489632,29.****968858,29.****216924,29.****84129,29.****891197,29.****225266,29.****474865,29.****518131,29.****380703,29.****585764,29.****719474,29.****204469,29.****095568,29.****026441,29.****568247,29.****187367,29.****890152,29.****751334,29.****198062,29.****282941,29.****467939,29.****781492,29.****730344,29.****239287,29.****226805,29.****344615,29.****067341,29.****012097,29.****712401,29.****04607,29.****385864,29.****553048,29.****77746,29.****766371,29.****317445,29.****562424,29.****417189,29.****524478,29.****958497,29.****798714,29.****724684,29.****425957,29.****101993,29.****874281,29.****868845,29.****723746,29.****010547,29.****446767,29.****64125,29.****558,29.****591817,29.****878542,29.****829606,29.****592162,29.****233886 | ****机关:****环境局 |
环评批复时间: | 2023-05-08 |
渝(涪)环准〔2023〕025号 | 本工程排污许可证编号:无 |
项目实际总投资(万元): | 8760 |
195 | 运营单位名称:**** |
****0102MA6175NK0W | 验收监测(调查)报告编制机构名称:**** |
****0102MA6175NK0W | 验收监测单位:******公司 |
****0112MA5UMBWK03 | 竣工时间:2024-06-05 |
调试结束时间: | |
2024-11-06 | 验收报告公开结束时间:2024-12-04 |
验收报告公开载体: | https://www.****.com/gs/detail/2?id=41106a3dwN公示链接 |
2、工程变动信息
项目性质
** | 实际建设情况:** |
无 | 是否属于重大变动:|
规模
**集气管道5条(A 线:焦页12#平台-板栗阀室,管线长度 6.75km ,管径 DN250 ,设计压力4.0MPa ,设计输气规模150×104m3/d。集气管线沿线不设置闸阀。B 线:焦页28#集气站-页岩气外输干线,管线长度 0.8km ,管径 DN200 ,设计压力4.0MPa ,设计输气规模 50×104m3/d。集气管线沿线不设置闸阀,设埋地球阀 1 座。C 线:焦页 40#集气站-页岩气外输干线,管线长度 0.6km ,管径 DN200 ,设计压力 4.0MPa ,设计输气规模100×104m3/d 。集气管线沿线不设置闸阀,设埋地球阀 1 座。D 线:页岩气外输干线-白涛增压站,管线长度3.78km,管径DN300 ,设计压力4.0MPa,设计输气规模 250×104m3/d。集气管线沿线不设置闸阀,设埋地球阀2座。E 线:焦页3#集气站- D 线(与页岩气外输干线-白涛增压站管线连接),管线长度9.02km,管径DN200 ,设计压力4.0MPa,设计输气规模50×104m3/d 。集气管线沿线不设置闸阀,设埋地球阀 1 座。),总长度20.95km,主要从焦页12#平台,28#集气站、40#集气站、3#集气站接至页岩气外输干线,**外输干线至拟建白涛增压站,沿线共设置埋地球阀5座 | 实际建设情况:**集气管道5条(A 线:焦页12#平台-板栗阀室,管线长度 6.54km ,管径 DN250 ,设计压力4.0MPa,设计输气规模150×104m3/d。集气管线沿线不设置闸阀。B 线:焦页28#集气站-页岩气外输干线,管线长度 0.75km ,管径 DN200 ,设计压力4.0MPa ,设计输气规模 50×104m3/d。集气管线沿线不设置闸阀,设埋地球阀 1 座。C 线:焦页40#集气站-页岩气外输干线,管线长度0.53km ,管径 DN200 ,设计压力 4.0MPa ,设计输气规模100×104m3/d 。集气管线沿线不设置闸阀,设埋地球阀 1 座。D 线:页岩气外输干线-白涛增压站,管线长度3.65km,管径DN300 ,设计压力4.0MPa,设计输气规模 250×104m3/d。集气管线沿线不设置闸阀,设埋地球阀2座。E 线:焦页3#集气站- D 线(与页岩气外输干线-白涛增压站管线连接),管线长度8.68km,管径DN200 ,设计压力4.0MPa,设计输气规模50×104m3/d 。集气管线沿线不设置闸阀,设埋地球阀 1 座。),总长度20.15km,主要从焦页12#平台,28#集气站、40#集气站、3#集气站接至页岩气外输干线,**外输干线至拟建白涛增压站,沿线共设置埋地球阀5座。 |
各管线建设长度均减少 | 是否属于重大变动:|
生产工艺
管道输送 | 实际建设情况:管道输送 |
无 | 是否属于重大变动:|
环保设施或环保措施
合理规划管道走向和施工计划,尽量避开雨季和汛期施工,施工时应尽可能缩小作业宽度,缩短施工周期,减少临时占地面积,并及时进行生态恢复,以减少水土流失对环境的影响。项目施工期不设单独设置施工营地,生活污水依托租赁房屋现有的污水处理设施进行处理;管道试压采用压缩空气,无试压废水产生;管线穿越溪沟应避免雨季和暴雨天气施工,涉水施工产生的基坑废水应沉淀后外排。采取分段施工,施工场地应采取洒水抑尘等措施;加强施工车辆运输管理,易撒漏物料使用密闭式汽车装载;运营期事故或检修状态下放空废气依托已经建成站点排放。尽量选用低噪声设备,并采取隔声、减振等措施,确保施工期噪声满足《建筑施工场界环境噪声排放标准》(GB12523-2011);运营期阀室厂界噪声满足《工业企业厂界环境噪声排放标准》(GB12348-2008)中2类标准。施工期土石方尽量就地回填,剩余土石方全部就近用于本项目综合利用,不得随意处置和堆放;施工废包装材料、废焊条等分类收集后交由有相应处理能力的单位回收利用;清管固废集中收集后交由相应处置能力单位处理。委托处置工业固废时,应对受托方的主体资格和技术能力进行核实,确保工业固废得到妥善处置。管道采取防腐措施并定期检查维修,按要求制定突发环境事件应急预案并备案。 | 实际建设情况:项目合理规划管道走向和施工计划,尽量避开雨季和汛期施工,施工时应尽可能缩小作业宽度,缩短施工周期,减少临时占地面积,并及时进行生态恢复,以减少水土流失对环境的影响。项目施工期不设单独设置施工营地,生活污水依托租赁房屋现有的污水处理设施进行处理;管道试压采用压缩空气,无试压废水产生;管线穿越溪沟应避免雨季和暴雨天气施工,涉水施工产生的基坑废水应沉淀后外排。采取分段施工,施工场地应采取洒水抑尘等措施;加强施工车辆运输管理,易撒漏物料使用密闭式汽车装载;运营期事故或检修状态下放空废气依托已经建成站点排放。项目选用低噪声设备,并采取隔声、减振等措施,确保施工期噪声满足《建筑施工场界环境噪声排放标准》(GB12523-2011),施工期无噪声投诉;项目不设阀室。项目施工期土石方就地回填,剩余土石方全部就近用于本项目综合利用,未随意处置和堆放;施工废包装材料、废焊条等分类收集后交由有相应处理能力的单位回收利用;清管固废集中收集后交由相应处置能力单位处理。委托处置工业固废时,应对受托方的主体资格和技术能力进行核实,确保工业固废得到妥善处置。管道采取防腐措施并定期检查维修,正在委托按要求制定突发环境事件应急预案并备案。 |
无 | 是否属于重大变动:|
其他
/ | 实际建设情况:/ |
无 | 是否属于重大变动:|
3、污染物排放量
0 | 0 | 0 | 0 | 0 | 0 | 0 | |
0 | 0 | 0 | 0 | 0 | 0 | 0 | |
0 | 0 | 0 | 0 | 0 | 0 | 0 | |
0 | 0 | 0 | 0 | 0 | 0 | 0 | |
0 | 0 | 0 | 0 | 0 | 0 | 0 | |
0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
4、环境保护设施落实情况
表1 水污染治理设施
表2 大气污染治理设施
表3 噪声治理设施
表4 地下水污染治理设施
表5 固废治理设施
表6 生态保护设施
1 | 合理规划管道走向和施工计划,尽量避开雨季和汛期施工,施工时应尽可能缩小作业宽度,缩短施工周期,减少临时占地面积,并及时进行生态恢复,以减少水土流失对环境的影响。 | 项目合理规划管道走向和施工计划,尽量避开雨季和汛期施工,施工时应尽可能缩小作业宽度,缩短施工周期,减少临时占地面积,并及时进行生态恢复,以减少水土流失对环境的影响。 |
表7 风险设施
1 | 管道采取防腐措施并定期检修维修,按要求指定突发环境事件应急预案并备案。 | 管道采取防腐措施并定期检修维修,已委托编制突发环境事件应急预案编制 |
5、环境保护对策措施落实情况
依托工程
/ | 验收阶段落实情况:/ |
/ |
环保搬迁
/ | 验收阶段落实情况:/ |
/ |
区域削减
/ | 验收阶段落实情况:/ |
/ |
生态恢复、补偿或管理
/ | 验收阶段落实情况:/ |
/ |
功能置换
/ | 验收阶段落实情况:/ |
/ |
其他
/ | 验收阶段落实情况:/ |
/ |
6、工程建设对项目周边环境的影响
/ |
/ |
/ |
/ |
/ |
/ |
7、验收结论
1 | 未按环境影响报告书(表)及其审批部门审批决定要求建设或落实环境保护设施,或者环境保护设施未能与主体工程同时投产使用 |
2 | 污染物排放不符合国家和地方相关标准、环境影响报告书(表)及其审批部门审批决定或者主要污染物总量指标控制要求 |
3 | 环境影响报告书(表)经批准后,该建设项目的性质、规模、地点、采用的生产工艺或者防治污染、防止生态破坏的措施发生重大变动,建设单位未重新报批环境影响报告书(表)或环境影响报告书(表)未经批准 |
4 | 建设过程中造成重大环境污染未治理完成,或者造成重大生态破坏未恢复 |
5 | 纳入排污许可管理的建设项目,无证排污或不按证排污 |
6 | 分期建设、分期投入生产或者使用的建设项目,其环境保护设施防治环境污染和生态破坏的能力不能满足主体工程需要 |
7 | 建设单位因该建设项目违反国家和地方环境保护法律法规受到处罚,被责令改正,尚未改正完成 |
8 | 验收报告的基础资料数据明显不实,内容存在重大缺项、遗漏,或者验收结论不明确、不合理 |
9 | 其他环境保护法律法规规章等规定不得通过环境保护验收 |
不存在上述情况 | |
验收结论 | 合格 |