国家电投白音华电厂500千伏送出工程
1、建设项目基本信息
企业基本信息
**** | 建设单位代码类型:|
911********859595Q | 建设单位法人:毛光辉 |
康喜明 | 建设单位所在行政区划:**自治区**市**区 |
**东街11号 |
建设项目基本信息
****电厂500千伏送出工程 | 项目代码:|
建设性质: | |
2021版本:161-输变电工程 | 行业类别(国民经济代码):D4420-D4420-电力供应 |
建设地点: | **自治区**** |
经度:118.51679,118.52714,118.54833,118.55318,118.51811,118.50456,118.39357,118.17799,118.15804,118.09923,118.07241,118.00457,117.97462,117.89962,117.84517,117.68735,117.62704,117.6191,117.58421,117.54555,117.44061,117.43947,117.37028,117.35044,117.34689,117.28237,117.26145,117.18073,117.13097,116.97974,116.94655,116.88748,116.84216,116.82598,116.77572,116.65016,116.49555,116.47441,116.50241,116.50525 纬度: 44.80591,44.80173,44.79564,44.78172,44.73132,44.66637,44.66117,44.70521,44.71292,44.71227,44.72133,44.73048,44.72015,44.71567,44.70526,44.68698,44.6721,44.67216,44.66553,44.66292,44.60183,44.59237,44.52813,44.51804,44.51194,44.48412,44.45292,44.42773,44.38654,44.36916,44.39116,44.38949,44.38324,44.39403,44.39453,44.36208,44.33776,44.29752,44.25655,44.24827 | ****机关:****生态环境厅 |
环评批复时间: | 2023-03-23 |
内环审〔2023〕15号 | 本工程排污许可证编号:无 |
项目实际总投资(万元): | 121874 |
703.7 | 运营单位名称:**** |
911********859595Q | 验收监测(调查)报告编制机构名称:****集团****设计院有限公司 |
912********938680X | 验收监测单位:**省****公司 |
****0102MA17DW4841 | 竣工时间:2024-01-27 |
调试结束时间: | |
2024-11-22 | 验收报告公开结束时间:2024-12-20 |
验收报告公开载体: | http://www.****.cn/html/md/gb/tzgg/****1122/858********122****000001.shtml |
2、工程变动信息
项目性质
** | 实际建设情况:** |
无 | 是否属于重大变动:|
规模
锡盟换流站扩建工程:在锡盟站西北侧扩建 500kV 出线间隔 2 个,****电厂;在锡盟站西北侧预留位置装设 2×180Mvar 高压并联电抗器,**一座高抗事故油池,占地0.22hm2。****电厂-锡盟换流站 500kV 线路工程:****电厂-锡盟换流站 500kV 线路工 程:****电厂,终点为锡盟换流站,路径长度约为 2×206.21km,其中 0.966km按照同塔双回路架设,其余按两个并行的单回路架设,**塔基共计 943 基。塔宝 I、II 线改造工程:改造塔宝 I、II 线,拆除塔宝线塔基 4 基,**塔宝线塔基 4 基,均为双回塔基,改造线路长度为 1.5km。 | 实际建设情况:锡盟换流站扩建工程:在锡盟站西北侧扩建 500kV 出线间隔 2 个,****电厂;在锡盟站西北侧预留位置装设 2×180Mvar 高压并联电抗器,**一座高抗事故油池,占地0.22hm2。****电厂-锡盟换流站 500kV 线路工程:****电厂-锡盟换流站 500kV 线路工 程:****电厂,终点为锡盟换流站,路径长度约为 2×206.21km,其中 0.966km按照同塔双回路架设,其余按两个并行的单回路架设,**塔基共计 944 基。塔宝 I、II 线改造工程:改造塔宝 I、II 线,拆除塔宝线塔基 4 基,**塔宝线塔基 4 基,均为双回塔基,改造线路长度为 1.5km。 |
无 | 是否属于重大变动:|
生产工艺
无 | 实际建设情况:无 |
无 | 是否属于重大变动:|
环保设施或环保措施
建设单位在工程施工期间要保护好生态环境,施工应采取有效的防尘措施,施工结束后及时清理施工垃圾。施工活动严格控制在征地范围内,尽可能减少对植被的破坏。严禁施工人员、施工设备越界活动。为保护植被生态环境,项目施工材料及设备尽量分拆改用小型运输工具运输,物料集中堆存,不得随意堆放。 | 实际建设情况:工程开工前,施工单位划定了施工区域并采取了彩条旗、硬质围挡等限界措施限定施工范围,减少了对植被的破坏,严禁了施工人员、施工设备越界活动。项目施工材料分拆运输后组装,物料集中堆,未发生随意堆放现象。 |
无 | 是否属于重大变动:|
其他
无 | 实际建设情况:无 |
无 | 是否属于重大变动:|
3、污染物排放量
0 | 0 | 0 | 0 | 0 | 0 | 0 | |
0 | 0 | 0 | 0 | 0 | 0 | 0 | |
0 | 0 | 0 | 0 | 0 | 0 | 0 | |
0 | 0 | 0 | 0 | 0 | 0 | 0 | |
0 | 0 | 0 | 0 | 0 | 0 | 0 | |
0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
0 | 0 | 0 | 0 | 0 | 0 | 0 | / |
5、环境保护对策措施落实情况
依托工程
运营期换流站生活污水经生活污水处理系统处理后,由环卫部门定期清淘,不外排 | 验收阶段落实情况:换流站本期间隔扩建不新增运营人员,换流站运营期生活污水经站内现有地埋式一体化污水处理装置处理后,由环卫部门清掏,不外排。 |
/ |
环保搬迁
无 | 验收阶段落实情况:无 |
/ |
区域削减
无 | 验收阶段落实情况:无 |
/ |
生态恢复、补偿或管理
(1)加强土石方的调配力度,进行充分的移挖作填,做到挖 填平衡; (2)合理组织工程施工,施工区域相对集中,减少施工用地; (3)施工开挖面及时平整,将视需要采取不同的治理措施, 临时堆土安全堆放; (4)施工时选用低噪声的施工设备,施工活动主要集中在白天进行; (5)对各类施工场地和员工生活区的生产废水和生活污水的 排放加强管理,严禁滥排; (6)建设期主要采取挡土墙、护坡、护面、排水沟等防护措施,剥离的表土和开挖出的土石方堆放时在堆土坡脚堆码两排双层土袋进行挡护,顶面用塑料布遮挡,用剥离的表土装入编织袋挡护剩余的剥离表土和基础开挖出的土石方; (7)加强对管理人员和施工人员的环境保护意识教育,加强生态保护法律法规宣传,要求文明施工,不得开展滥采滥挖滥伐等植被破坏活动; (8)规范施工方式塔基开挖过程中,应合理组织施工,选择科学的施工方式尽量 减少临时施工用地的占地面积,尽可能根据实地情况,采取斜拉牵张等占地面积小,对植被干扰较小的牵张方式;严格按设计的占地面积、样式要求开挖,避免大规模开挖;施工人员和施工机械不得在规定区域范围外随意活动和行驶,尽量缩小施工作业范 围,施工便道宽度不得大于 6m,固定机械与车辆行驶路线,施工材料有序堆放,尽可能减少对塔基周围生态的破坏;生活垃圾和建筑垃圾集中收集、集中处理,不得随意丢弃。 | 验收阶段落实情况:(1)已加强土石方的调配力度,进行了充分的移挖作填,做到了挖填平衡; (2)已合理组织工程施工,施工区域集中布置,减少了施工占地; (3)已及时平整施工开挖面,已视需要采取不同的治理措施,临时堆土进行苫盖; (4)施工时已选用低噪声的施工设备,未进行夜间施工; (5)已各类施工场地和员工生活区的生产废水和生活污水的排放加强管理,生产废水经废水沉淀池处理后循环利用不外排;生活污水依托施工人员租住的民房已有的污水处理设施。 (6)施工中已采取挡土墙、护坡、护面、排水沟等防护措施,已将剥离的表土和开挖出的土石方堆放时在堆土坡脚堆码两排,并用双层土袋进行挡护,顶面用塑料布遮挡。 (7)已加强对管理人员和施工人员的环境保护意识教育,加强了生态保护法律法规宣传,并发放宣传册,已要求文明施工,未出现滥采滥挖滥伐等植被破坏活动; (8)已规范施工方式塔基开挖过程中,已合理组织施工,已尽可能根据实地情况,选择采取斜拉牵张等科学的施工方式减少了临时施工用地的占地 面积,减少了对植被的干扰;已严格按设计的占地面积、样式要求开挖,避免了大规模开挖;严格控制了施工边界,施工人员和施工机械未在规定区域范围外 随意活动和行驶,尽量缩小了施工作业范围,施工便道宽度为6m。已固定机械与车辆行驶路线,已将施工材料有序堆放,减少了塔基周围生态的破坏;生活垃圾和建筑垃圾集中已收集、集中处理,定期清运至指定地点,未随意丢弃。 |
/ |
功能置换
无 | 验收阶段落实情况:无 |
/ |
其他
无 | 验收阶段落实情况:无 |
/ |
6、工程建设对项目周边环境的影响
/ |
/ |
/ |
/ |
/ |
/ |
7、验收结论
1 | 未按环境影响报告书(表)及其审批部门审批决定要求建设或落实环境保护设施,或者环境保护设施未能与主体工程同时投产使用 |
2 | 污染物排放不符合国家和地方相关标准、环境影响报告书(表)及其审批部门审批决定或者主要污染物总量指标控制要求 |
3 | 环境影响报告书(表)经批准后,该建设项目的性质、规模、地点、采用的生产工艺或者防治污染、防止生态破坏的措施发生重大变动,建设单位未重新报批环境影响报告书(表)或环境影响报告书(表)未经批准 |
4 | 建设过程中造成重大环境污染未治理完成,或者造成重大生态破坏未恢复 |
5 | 纳入排污许可管理的建设项目,无证排污或不按证排污 |
6 | 分期建设、分期投入生产或者使用的建设项目,其环境保护设施防治环境污染和生态破坏的能力不能满足主体工程需要 |
7 | 建设单位因该建设项目违反国家和地方环境保护法律法规受到处罚,被责令改正,尚未改正完成 |
8 | 验收报告的基础资料数据明显不实,内容存在重大缺项、遗漏,或者验收结论不明确、不合理 |
9 | 其他环境保护法律法规规章等规定不得通过环境保护验收 |
不存在上述情况 | |
验收结论 | 合格 |